To Implement OEE computation company wide, The follwoing steps are very usefull ....
| Company- Wide OEE System Development Steps | |
| 1 | Current State Analysis |
| 1.01 | No of machines |
| 1.02 | Production data collection system |
| 1.03 | Time base data collection system |
| 1.04 | Method of data collection |
| 2 | OEE definition |
| 2.01 | Machine Cycle time |
| 2.02 | Loss definition |
| 2.03 | Planned shutdown Definition |
| 2.04 | OEE calculation method |
| 2.05 | Review Method |
| 2.06 | Design OEE computation system |
| 2.07 | Design data collection system |
| 3 | Design OEE system |
| 3.01 | Computation system |
| 3.1 | data collection system |
| 4 | Hardware requirement |
| 4.01 | Computer |
| 4.02 | Data collection sheet |
| 4.03 | manpower |
| 5 | Training |
| 5.01 | Supervisor / Operator - Data collection method |
| 5.02 | Engineer / Supervisor - data entry and analysis |
| 5.03 | manager / engineer - Review / audit system |
| 6 | Installation and Rollout |
| 6.01 | Try out of OEE system on selected machine |
| 6.02 | Check and modify OEE Sheet |
| 6.03 | Start OEE system for entire Shop Machine |