To Implement OEE computation company wide, The follwoing steps are very usefull ....
Company- Wide OEE System Development Steps | |
1 | Current State Analysis |
1.01 | No of machines |
1.02 | Production data collection system |
1.03 | Time base data collection system |
1.04 | Method of data collection |
2 | OEE definition |
2.01 | Machine Cycle time |
2.02 | Loss definition |
2.03 | Planned shutdown Definition |
2.04 | OEE calculation method |
2.05 | Review Method |
2.06 | Design OEE computation system |
2.07 | Design data collection system |
3 | Design OEE system |
3.01 | Computation system |
3.1 | data collection system |
4 | Hardware requirement |
4.01 | Computer |
4.02 | Data collection sheet |
4.03 | manpower |
5 | Training |
5.01 | Supervisor / Operator - Data collection method |
5.02 | Engineer / Supervisor - data entry and analysis |
5.03 | manager / engineer - Review / audit system |
6 | Installation and Rollout |
6.01 | Try out of OEE system on selected machine |
6.02 | Check and modify OEE Sheet |
6.03 | Start OEE system for entire Shop Machine |